|
|
|
|
|
|
|
|
Lauren and Georgia checking the instrument
|
Garry begins LEMO repair training
|
Garry and Steve practice making cables
|
Steve pulls back some insulation
|
|
|
|
|
|
|
|
|
Garry works on a cable
|
Dana cuts heat shrink for a LEMO cable
|
Dana begins separating the detectors
|
A view outside from inside the PIG barn
|
|
|
|
|
|
|
|
|
Garry repairs and Lauren inspects
|
The crew works on the top module
|
From another angle
|
Lauren and Georgia inspecting cables
|
|
|
|
|
|
|
|
|
Erich checks in with the TIGER group
|
Garry continues to work
|
Georgia inspects
|
Installing repaired cables underneath and around
|
|
|
|
|
|
|
|
|
Garry inspects the new Cherenkov PMT
|
Old LEMO connectors
|
|
|
|
|